US 36 Bridge Replacement
This project included two 160-foot span bridges between Anton and Last Chance, Colorado. The bridge structures are supported by 48-inch diameter caissons, large steel piles, and precast girders. Scope also included two bypasses, each with 30,000 CY of dirt and 350 LF of 86-inch diameter temporary storm drainage pipe, cast-in-place concrete decks, bridge rail, asphalt milling / paving, and electrical line relocation.
Location
Last Chance, CO
Owner
Colorado Department of Transportation
Market
Transportation
engineer
Amec Foster Wheeler (Engineer)
Related Projects
View All ProjectsArvada, CO
Health Sciences Campus Expansion
Denver, CO
Mullen High School
Parker, CO