Skip to content

US 36 Bridge Replacement

This project included two 160-foot span bridges between Anton and Last Chance, Colorado. The bridge structures are supported by 48-inch diameter caissons, large steel piles, and precast girders. Scope also included two bypasses, each with 30,000 CY of dirt and 350 LF of 86-inch diameter temporary storm drainage pipe, cast-in-place concrete decks, bridge rail, asphalt milling / paving, and electrical line relocation.

Location

Last Chance, CO

Owner

Colorado Department of Transportation

Market

Transportation

engineer

Amec Foster Wheeler (Engineer)

Related Projects

View All Projects
photo of Health Sciences Campus Expansion

Arvada, CO

Health Sciences Campus Expansion

photo of Mullen High School

Denver, CO

Mullen High School

photo of Legend High School

Parker, CO

Legend High School